Extension Cell – Newcastle NSW
Orica Kooragang Island, Newcastle, NSW New extension cell to the Ammonia Plant. This large single cross flow tower was part of a series of contracts

Orica Kooragang Island, Newcastle, NSW New extension cell to the Ammonia Plant. This large single cross flow tower was part of a series of contracts

Dyno Nobel, Project Aurora, Moranbah, QLD New four (4) cell cooling tower for the new Ammonium Nitrate Plant This project was originally designed in 2008,

Natural draught cooling tower performance improvement. Design improvement to achieve 0.5°C colder return water temperature from the NDCT. Through determine the hot and cold exit

Breezewater provided initial consultancy and guidance post the collapse of the Marley 600 series double side cross flow cooling tower. Major structural rebuild of the

Iluka, Capel, WA Replacement of a two (2) cell Marley counterflow tower on the existing basin. Pre-construction of the tower frames, in the months prior

The Challenge: When Caltex needed some rework on a cooling tower for its Queensland oil refinery, initial inspections revealed a number of critical structural weaknesses.

The Challenge: The Wallerawang site housed two 12 cell cooling towers. Due to the age of the existing frame members one of the towers suffered

The Challenge: Breezewater were tasked with providing a replacement cooling tower that could be changed over within a five day shutdown, where normal cooling tower

The Challenge: Breezewater were requested to provide a replacement cooling tower that could be installed and operational within a 14 day shutdown period, where normal
Whether you are after a little inspiration or curious how far our capabilities stretch, we invite you to browse our project showcase. If the solution you are searching for isn’t on display, please reach out so we can discuss your options. We are always up for a challenge.

Orica Yarwun, QLD Replacement of AN2 Cooling Tower. Retro fit new two (2) Cell cooling tower onto existing basin providing 25% increased thermal capacity Photo

Ampol Lytton Refinery, QLD New Main Cooling Tower and replace existing six (6) cell cooling tower complete with pipe work. Construct new six (6) cooling

Wilmar Plane Creek Mill, QLD Refurbishment of the Pritchard Cooling Tower. The project had been developed two to three years prior and included the replacement

Isis Central Sugar Mill, Childers, QLD Strengthening of two remaining cells post collapse of the tower. The Client required all three cells to be operational