Strengthening 2 Cooling Tower Cells – Childers, QLD

Isis Central Sugar Mill, Childers, QLD

Strengthening of two remaining cells post collapse of the tower.

The Client required all three cells to be operational through the 2021 crush. This resulted in a new tower and the strengthening / repair of the remaining two cells of the original cross flow towers. Breezewater repaired the structure that was damaged from the collapse of cell one and replaced the hot water decking to ensure they could accept the full flow of cooling water from the mill.