Pritchard Tower and replacement access staircase – Mt Isa

Glencore
Mt Isa Mines
Replaced Hot Water Decking to Four (4) Cell Pritchard Cross Flow Tower

Breezewater has been systematically repair the Pritchard cooling tower during the annual shutdowns since 2018 to ensure that the tower remains operational.

This is complicated as the time frames are very short and the work required extensive. Working with the client we prioritise the work each year so that the operational risk profile is reducing each visit.

Scroll to Top