The Challenge: Breezewater were requested to provide a replacement cooling tower that could be installed and operational within a 14…
Blog

Orica Australia Pty Ltd, Botany, NSW
819
The Challenge: Breezewater were tasked with providing a replacement cooling tower that could be changed over within a five day…

Energy Australia, Wallerawang, NSW
1022
The Challenge: The Wallerawang site housed two 12 cell cooling towers. Due to the age of the existing frame members…

Caltex Refineries (Qld) Pty Ltd
827
The Challenge: When Caltex needed some rework on a cooling tower for its Queensland oil refinery, initial inspections revealed a…